1. ladder ahead of work (insulation) 2. tape purlins. mark cut at intervals-50 1/2, 48, 48, 48, etc. 3. remove cover to cut 4. string from top between purlins to support and sag insulation evenly. 5. measure and cut insulation 6. line up with cut and unroll from top, supported by string, to eave. 7. join at eave. 8. attach horizontal stops at endwall 9. attach vertical stop at top of sidewall 10. lay out tracks for sheet on roof 11. slide sheet up along tracks 12 remove tracks 13 check square from endwall edge 14 secure to purlins 15 cut away string from inside